LNER Quad-Art Set

Build Date 1924
Operators                                              London North Eastern Railway & British Railways
Livery Varnished Teak
Status: In Service
Owned By
M&GN Society

LNER Quad-Art Set

The Quad-Art set is the railway’s most historically important rake of coaches and has been described as “the most important coaches in preservation to not be housed in the national collection”. The reason for this importance is articulation. In the 1920’s & 1930’s all of the “big four” railway companies designed articulated coaching sets i.e. two or more carriage bodies sharing intermediate bogies. This allowed a reduction in weight, a reduced number of components and therefore maintenance, and closer coupling of individual carriages allowing a higher passenger capacity where train lengths had to be limited.

The Quad Art sets, as the name suggests, were four carriage articulated sets, built originally for the Great Northern Railway under Nigel Gresley who continued to build them under the London North Eastern banner post 1923. Our example, set 74, emerged in 1924. Gresley’s Quad-Arts were designed for the short platforms of the Kings Cross former Great Northern suburban lines. Steep gradients down the tunnels to Moorgate in London further exacerbated the need for such stock, especially given the universal problem of overcrowding from which all London suburban lines suffered from.

The Quad-Arts ran in permanently coupled pairs, creating a formidable eight coach train with an impressive capacity of over 600 whilst still fitting in the 350ft long platforms. The reduced weight allowed successful operation into Moorgate and also allowed fast acceleration of the steam locomotives in use at the time on the way in and out of the capital when making the frequently required station stops.

The interiors were basic: plain unbuttoned moquette on very thin bench seat backs and bases. The side and door panelling was oak matchboard. The bulkhead partitions had mahogany panelling below cornice level with three picture frames and wired luggage racks.

Set 74 spent around half of its life in original varnished teak livery but the London smog and continuous operation in tunnels and behind hard working steam engines meant the woodwork was perpetually dirty and increasingly hard to maintain despite regular re-varnishing. By the early 1950’s, having been passed onto British Railways the coaches were painted into crimson livery (and later maroon). The 1960’s saw the steam motive power replaced by diesels but the wooden Quad-Arts were now dated and showing the effects of a hard life.

Following over 40 years’ intensive use, the last sets were finally withdrawn from the Great Northern lines in April 1966 having latterly been retained to cover as spares for their replacements: the steel bodied Mark 1 suburban sets. The last Quad sets (67, 79 and 90) were transferred to Sheffield and worked local summer specials until their final withdrawal in September 1966. The others, including set 74 withdrawn in early 1966, had never regularly strayed from the lines on which they were built for.

Preservation

Set 74 was sent to A. King and Sons at Wymondham in Norfolk for scrapping. It was considered suitable for the embryonic North Norfolk Railway and transferred to Sheringham as part of a convoy containing the first rolling stock for the railway. The set was seen in the same way as the LNER: useful as a high capacity set with less weight, only unlike the LNER who wanted light trains for fast acceleration between stops, the NNR wanted a light train to haul by the small industrial steam locomotives used in preservation at that time.

What was not fully appreciated until later was that of the hundreds of steam-age articulated carriages built for multiple railway companies in the UK, every single one was scrapped except the Quad-Art saved for the NNR. Not only did this make the set unique as the only Quad-Art to be saved for future generations, it also made it unique as the only complete steam-age example of the articulated concept. From the 1990’s onward, articulation in the UK returned with the international “Eurostar” sets running through the Channel Tunnel, but set 74 remains a historically priceless reminder of where that design came from.

On arrival at the fledgling NNR, the Quad-Arts operated the first passenger services but were in a poor state of repair with the many doors and doorways a major issue. It ran throughout the 1970’s with an increasingly large number of compartments locked out of service until total withdrawal and storage was forced in 1979.

For the next 20 years the set was stored and spent much of that time in the sidings at Holt. During this time the condition of the set reached a point of dereliction and it had become painfully accepted that without some external help, set 74 was not going to survive and could never be restored properly. In 2001 a comprehensive survey was undertaken which estimated the cost of restoration to be £500,000. One major issue was paradoxically the set’s most historic feature: the articulation. A staged restoration of one coach at a time over may years (or even decades) would not be practical given the connected nature of the set, it was to be all or nothing.

After a generous benefactor offered £50,000 if it could be matched, optimistically, fundraising began to restore the set. Following an appeal and articles in the railway press, the Heritage Lottery Fund put forward a match funded grant of £341,000 with representatives from the National Railway Museum acting as project monitors. This game changing funding award was in addition to £308,000 granted by the Heritage Lottery Fund for the construction of Bridge Road Carriage Sheds, which were built in part to store the Quad-Art set, once restored, in dry conditions.

From 2003 to 2008, the four vehicles were fully restored by contractors at the West Coast Railway Company (Carnforth). During this time, most of the refurbishment changes British Railways had made during the 1950’s were removed and the fabric of the coaches themselves transformed back to their original 1924 condition. The varnished teak made a return after 60 years. Much extra work was found over the five-year restoration and it was obvious that an in-house restoration funded conventionally would never have been possible. Fortunately, the restoration was a great success and the resplendent set 74 officially returned to service in June 2008.

Such a special set of carriages have demanded careful treatment to maintain the ground gained during the main restoration. The set was used sparingly, usually at special events, and berthed undercover away from the elements between use. Regular re-varnishing (around every two years) has been maintained.

In 2018, following ten years of use, water started leaking into the compartments so the set received an intermediate refresh. The roofs were resealed and repainted correcting the leaks quickly and the usual 2-year re-varnish was supplemented by replacement brake blocks and a repaint of the running gear and painted external furniture on the coach bodies. The set was returned to service for further occasional use.

In 2020, the isolated compartments proved essential to running a socially distanced Covid pandemic friendly service, with the set being unusually used on daily services for the first time since the 1960’s. This intensive use took its toll and another refresh was required afterwards to reverse any wear and tear and additionally in 2023 worn out wheel profiles were corrected by swapping out two axles with spares and tyre turning the whole set.

Today, the Quad-Art set continues to operate on special events and at certain times of year when an extra set of coaches is required. They are in good condition and continue to be maintained to safeguard their future use, which is especially important given their historical significance.

Number Type
48861 Brake Third
48862 Third
48863 Third
48864 Third